Installing solar at a school is different from installing it at an empty commercial site. Classes cannot stop, students and teachers need to move safely, and the installation work has to fit around the school’s daily schedule.
At SSV 3, Vadodara, Sunbuy Renewables had a clear target: install a 55.3 kW rooftop solar system in just 15 days—without letting the project disturb the rhythm of the school.
Why was this solar installation a tricky one?
A 55.3 kW solar project involves much more than mounting panels on a rooftop. Structure installation, module mounting, cabling, electrical work, safety arrangements, testing, and commissioning all need to happen in the right sequence.
But at SSV 3, there was another factor: the school could not simply pause its regular activities for the installation.
The project therefore required careful coordination between the school and Sunbuy’s execution team. Every activity had to be planned around the school environment while maintaining the required quality and safety standards.

How did Sunbuy complete the project in just 15 days?
The key was not simply working faster—it was planning better before the work began.
Sunbuy’s team coordinated material, manpower, rooftop activities, and electrical work to keep the project moving as planned.
Some of the key execution priorities were:
- Detailed planning before starting the installation
- Coordinated material and manpower management
- Safe execution around an active school campus
- Step-by-step installation and electrical work
- Continuous progress monitoring
- Testing and commissioning within the planned timeline
And the result?
“”A 55.3 kW rooftop solar system successfully installed at SSV 3 in just 15 days.

What does solar mean for a school?
For SSV 3, this project is more than adding solar panels to the rooftop. It is a move towards clean energy, better energy management, and a more sustainable campus.
A school solar installation can also create a real-world learning opportunity. Students who learn about renewable energy in classrooms can now see solar power being generated on their own school premises.
The project brings several practical benefits:
- Better utilization of available rooftop space
- Greater use of clean and renewable energy
- Potential reduction in long-term electricity expenses
- A visible step towards a sustainable campus
- A practical example of solar energy for students
What did SSV 3 say about the experience?
“”Sunbuy Renewables understood our requirements and completed the 55.3 kW solar installation within the committed 15-day timeline. The team’s coordination and execution made the entire process smooth for us.
— SSV School 3, Vadodara
Final Thoughts
The SSV 3 project shows how the right planning and execution can make even a time-sensitive school solar installation smooth and successful. In just 15 days, Sunbuy Renewables completed the 55.3 kW rooftop solar project, helping the school take a practical step towards clean and sustainable energy.
Looking to install solar for your school or institution? Connect with Sunbuy Renewables and take the first step towards smarter energy.